Corporate publications

We produce a range of publications to provide the community and stakeholders with information about our operations and activities.

Our corporate plans and reports 

Seqwater Stategic Plan 2018-23
Sets out our strategic direction, purpose and key priorities.

Seqwater Operational Plan 2018-19
The performance agreement between us and our responsible Ministers that sets our financial and non-financial performance targets for the year.

Seqwater Annual Report 2018-19
Annual performance report against targets set out in the operational plan for the financial year.

Water Security Program 2016-2046
Our blueprint for managing water over the next 30 years, within the guidelines set by the Department of Natural Resources, Mines and Energy.

2018 Water Security Program Annual Report
Annual performance report against the Water Security Program for the financial year. Read more here.

Queensland Bulk Water Supply Authority Performance Report 2017-18
Our annual report on the performance reporting framework against key performance indicators (KPIs), as per the Water Supply (Safety and Reliability) Act 2008.

Water Service Providers Performance Report 2016-17
Our annual report on the performance of water service providers, as per section 142A of the Water Supply (Safety and Reliability) Act 2008.

Operational plans and reports

South East Queensland (SEQ) Bulk Water Supply Code
Administered by Department of Energy and Water Supply, regulates the supply of bulk services such as the supply of water and water services, between Code-regulated Entities (e.g. Council and council-owned service providers).

Volume Calculation Methodology (VCM)
The VCM is used to calculate the cost of providing a Bulk Service to an un-metered Bulk Supply Point. The VCM may be reviewed if requested by a Code-regulated Entity and Seqwater will undertake consultation with affected Code-regulated entities prior to making any amendment to the VCM.

Technical Standard Specification - Supply and installation bulk supply meters for potable water
This standard specification provides the minimum requirements for Seqwater work relation to the design, supply and installation of bulk supply (revenue) meters for potable water. It does not apply to meters used for non-revenue applications.

Flood manuals and emergency plans

Manual of Operational Procedures for Flood Mitigation at Wivenhoe Dam and Somerset Dam Revision 14 (November 2016)

Manual of Operational Procedures for Flood Mitigation at North Pine Dam Revision 9 (November 2014)

Emergency Action Plans for Referable Dams
We have an approved action plan for each of our referable dams. You can download them from the Department of Natural Resources, Mines and Energy website.

Drinking Water Quality Management Plan (DWQMP) reports

Western Corridor Recycled Water Scheme Annual Report 2017-18

Wyaralong Dam Estuarine Ecological Management Plan Annual Report
In accordance with the Environmental Protection and Biodiversity Conservation approval for operation of the Wyaralong Dam (ref: 2006/3157), Seqwater is required to publish the annual report for the Wyaralong Dam Estuarine Ecological Management Plan (EEMP). The report documents as a review of the monitoring data collected in 2012. Based on the indicators assessed in 2011 and 2012, no detrimental changes in physical, chemical or ecological conditions in the Logan River estuary or southern Moreton Bay were attributable to the Wyaralong Dam construction or operation.

Banksia Beach - Borefield Environmental Management Plan
In accordance with the approval (ref: 2007/3396) issued under the Environmental Protection and Biodiversity Conservation Act (1999), for the Bribie Island Water Treatment Plant and Borefield, Seqwater is required to publish the Borefield Environmental Management Plan. 

Bribie Island Borefield - Annual Compliance Report 2017-18
In accordance with the approval (ref: 2007/3396) issued under the Environmental Protection and Biodiversity Conservation Act 1999, this annual compliance report is the fourth compliance report on the operation and management of the Basnkia Beach Water Treatment Plant and Borefield under the Borefield Environmental Management Plan (BEMP). This report addressed compliance with the conditions of approval between 1 September 2017 and 31 August 2018.

Bribie Island Borefield Annual Compliance Report 2016-17
Part A [2MB] | Part B [2MB] | Part 3 [MB] | Part 4 [2MB] | Part 5 [2MB] | Part 6 [2MB]
In accordance with the approval (ref: 2007/3396) issued under the Environmental Protection and Biodiversity Conservation Act 1999,  this annual compliance report is the third compliance report on the operation and management of the Banksia Beach Water Treatment Plant and Borefield under the Borefield Environmental Management Plan (BEMP). This report addresses compliance with the conditions of approval between the 1 September 2016 and 31 August 2017.

Northern Pipeline Interconnector Stage 2 Annual Compliance Report 2018-19
This annual compliance report is the ninth compliance report on Matters of National Environmental Significance (MNES) for the Northern Pipeline Interconnector Stage 2 (NPI Stage 2) and addresses the requirements of conditions applied to the project under the Environmental Protection and Biodiversity Conservation Act 1999 (EPBC Act).