Central Lockyer Valley Scheme
The scheme was established to support irrigation in dairy, vegetable and forage crops sectors following construction of various weirs from the 1940s to the 1980s, Bill Gunn Dam in 1988, Lake Clarendon in 1992 and the Morton Vale Pipeline in the mid-1990s.
Located east of Gatton, the scheme is supplied by Clarendon and Bill Gunn dams. Both are offstream storages filled by diverting water from nearby creeks during significant flow events.
The Central Lockyer Valley scheme supplies water for the Morton Vale Pipeline, recharges the groundwater areas adjacent to Lockyer Creek, and supplies downstream area-based surface-water entitlements.
The scheme is also located in the Clarendon Sub-artesian Area which is a benefitted groundwater area, with irrigators being licensed, metered and charged for their groundwater use.
Scheme Operations Manual: Central Lockyer Valley WSS Operations Manual
Resource Operations Licence: Central Lockyer Valley WSS Resource Operations Licence (ROL)
Water year: The water year starts 1 January and ends 31 December
Scheme map: Central Lockyer Valley scheme map
Announced allocations
Water year
1 January 2026 - 31 December 2026
Allocation
Underground Water
- Low priority A - All zones: 100%
- Medium priority A - All zones: 100%
Surface Water
- Medium priority C - All zones: 100%
Morton Vale Pipeline
- Medium priority B - MVP: 100%
Announced allocation effective
Underground Water & Morton Vale Pipeline: 1 January 2026 - 31 December 2026
Surface Water: 1 January 2026 - 31 December 2026
Customers are encouraged to obtain information about their available water balances (ML) by calling their Irrigation Team on 1300 737 928 or email [email protected].
Water trading
For information about permanent water allocation transfers, seasonal assignments, temporary trades, application forms, service standards and Customer Connect, visit our Water trading page. This page provides the full process and requirements for buying, selling or trading water allocations.
Water supply contract
For information about water supply contract requirements, deemed contracts and water allocation transfers, view our Water supply contracts page.
Download a copy of the Central Lockyer Valley Scheme contracts:
Moreton Water Plan
The Water Plan (Moreton) (Supply Scheme Arrangements) Amendment Plan 2019 for the Central Lockyer Water Supply Scheme was finalised on Friday, 13 December 2019.
Implications for irrigation prices when volumetric water allocations are granted
Reports
Operational Reports
- Announced Allocation Operational Report - Surface Water effective 1 January 2026
- Announced Allocation Operational Report - Underground Water effective 1 January 2026
- Announced Allocation Operational Report - Surface Water effective 1 April 2025
- Announced Allocation Operational Report - Surface Water effective 1 January 2025
- Announced Allocation Operational Report - Underground water effective 1 January 2025
- Announced Allocation Operational Report - Surface Water effective 1 December 2024
- Announced Allocation Operational Report – Surface Water and Morton Vale Pipeline effective 1 April 2024
- Announced Allocation Operational Report – Surface Water and Morton Vale Pipeline effective 1 March 2024
- Announced Allocation Operational Report - Surface Water and Morton Vale Pipeline effective 20 February 2024
- Announced Allocation Operational Report - Surface Water and Morton Vale Pipeline effective 1 February 2024
- Announced Allocation Operational Report – Surface Water and Morton Vale Pipeline effective 1 January 2024
- Announced Allocation Operational Report – Underground Water effective 1 January 2024
- Announced Allocation Operational Report - Surface Water and Morton Vale Pipeline effective 1 January 2023
- Announced Allocation Operational Report - Underground Water effective 1 January 2023
- Announced Allocation Operational Report - Surface Water and Morton Vale Pipeline effective 23 May 2022
- Announced Allocation Operational Report - Surface Water and Morton Vale Pipeline effective 1 May 2022
- Announced Allocation Operational Report - Surface Water and Morton Vale Pipeline effective 1 April 2022
- Announced Allocation Operational Report - Underground Water effective 1 April 2022
- Announced Allocation Operational Report - Surface Water and Morton Vale Pipeline effective 1 March 2022
- Announced Allocation Operational Report - Surface Water and Morton Vale Pipeline effective 1 February 2022
- Announced Allocation Operational Report - Surface Water and Morton Vale Pipeline effective 1 January 2022
- Announced Allocation Operational Report - Underground Water effective 1 January 2022
- Announced Allocation Operational Report - Surface Water and Morton Vale Pipeline effective 1 December 2021
- Announced Allocation Operational Report -Surface Water and Morton Vale Pipeline effective 1 January 2021
- Announced Allocation Operational Report – Underground Water effective 1 January 2021
- Announced Allocation Operational Report - Underground Water effective 1 April 2020
- Announced Allocation Operational Report - Surface Water and Morton Vale Pipeline effective 1 April 2020.
Scheme Performance Report
The annual Scheme Performance Report (SPR) - previously known as Network Service Report (NSP) - contains scheme information such as historical water usage information and covers both operating and renewals expenditure and future material renewal forecast expenditure. The current year annual SPR and prior year annual NSPs can be accessed via the links below.
Service targets
View the service targets for the Central Lockyer Valley Water Supply Scheme.
From 2016-17, Seqwater will publish annual performance reports detailing our performance against each target.
Customer consultation
Seqwater holds customer consultation forums at least annually to consult on the network service plan and customer service standards as well as other Scheme issues that may arise from time to time. Attendance at customer consultation forums is open to all irrigation customers of the Scheme and other stakeholders.
The date, time and location of the next consultation forum will be advised.