Emergency Contact
Home Leslie Harrison Dam upgrade Dam Road site access now open

Dam Road site access now open

The temporary bridge over the spillway is now complete and is being used by trucks and other heavy vehicles to access the work site.

The temporary bridge over the spillway is now complete and is being used by trucks and other heavy vehicles to access the work site. Trucks are entering the site from Dam Road off Mount Gravatt-Capalaba Road.

Want to se how we built the temporary bridge? Check out this video!

There are changed traffic conditions on Mount Gravatt-Capalaba Road near the interchange with Moreton Bay Road. Trucks will be accessing Dam Road between 7am and 5pm. Please drive with caution and observe all signage in place. Dam Road is only accessible to construction vehicles.

The completion of the bridge means that only light vehicles (personal cars and utes) will be regularly using Larbonya Crescent and Willowie Crescent. These local roads will remain a backup contingency route for other vehicles to access site if required, such as during maintenance on the temporary bridge.

Any questions?

For all media enquiries, please contact a member of our media team by phone or email:

07 3247 3000

[email protected]

More from Seqwater