Mary Valley Scheme
The scheme was established to support irrigation in sugar, dairy and horticulture sectors following construction of Borumba Dam in 1964.
The Scheme includes the ponded area of Borumba Dam and stretches downstream along Yabba Creek for 31 kilometres, then downstream along the Mary River for a further 142 kilometres to the end of the scheme west of Tiaro.
Pie Creek is a diversion system consisting of 4.5 kilometres of channel and 6.8 kilometres of pipeline to divert water from the Mary River, via the Pie Creek Pump Station, into Pie Creek, McIntosh Creek and Callico Creek.
Scheme Operations Manual: Mary Valley WSS Operations Manual
Resource Operations Licence: Mary Valley WSS Resource Operations Licence (ROL)
Water year: The water year starts 1 July and ends 30 June
Scheme map: Mary Valley scheme map
Announced Allocations
Water year
2026-27
Allocation
High priority: 100%
Medium priority: 100%
Announced allocation effective
1 July 2026 - 30 June 2027
Customers are encouraged to obtain information about their available water balances (ML) by calling their Irrigation Team on 1300 737 928 or email [email protected]
Water trading
For information about permanent water allocation transfers, seasonal assignments, temporary trades, application forms, service standards and Customer Connect, visit our Water trading page. This page provides the full process and requirements for buying, selling or trading water allocations.
Water supply contract
For information about water supply contract requirements, deemed contracts and water allocation transfers, view our Water supply contracts page.
Customers of the Pie Creek supply system are required to also be a party to a distribution supply contract. This is because water is diverted from the Mary River to supply irrigators via the infrastructure and creeks that comprise the Pie Creek supply system.
Download a copy of the Mary Valley Scheme contracts:
Reports
Scheme Performance Report
The annual Scheme Performance Report (SPR) - previously known as Network Service Report (NSP) - contains scheme information such as historical water usage information and covers both operating and renewals expenditure and future material renewal forecast expenditure. The current year annual SPR and prior year annual NSPs can be accessed via the links below.
Operational Report
- Operational Report effective 1 July 2026
- Operational Report effective 1 July 2025
- Operational Report effective 1 July 2024
- Operational Report effective 1 July 2023
- Operational Report effective 1 July 2022
- Operational Report effective 1 September 2021
- Operational Report effective 1 August 2021
- Operational Report effective 1 July 2021
Service targets
View the service targets for the Mary ValleyWater Supply Scheme.
From 2016-17, Seqwater will publish annual performance reports detailing our performance against each target.
Customer consultation
Seqwater holds customer consultation forums at least annually to consult on the network service plan and customer service standards as well as other Scheme issues that may arise from time to time. Attendance at customer consultation forums is open to all irrigation customers of the Scheme and other stakeholders.
The date, time and location of the next consultation forum will be advised.
Further information
For further information or if you have any questions please contact us at [email protected]