Seqwater is planning the construction of a new two-lane bridge adjacent to the existing Mt Crosby Weir Bridge as part of the East Bank Flood Resilience Program.  In planning for the new bridge Seqwater will need to undertake engineering assessments of the existing weir bridge. The engineering assessments will require the temporary closure of the bridge for two nights.

Work will take place at night to minimise traffic impacts.

 What to expect:

  • Work is to occur from Monday 7 June 2021 and Tuesday 8 June 2021 subject to weather conditions and other unexpected delays.
  • Working hours are between 6.00pm and 6.00am. 
  • Temporary bridge closure with traffic controllers diverting vehicles to Colleges Crossing.
  • Equipment will include, but is not limited to, a truck mounted under-bridge inspection unit, and utility vehicles. 
  • Concrete drilling may be required, this work will be conducted early in the evening. 
  • There may be an increase in noise and traffic - we will minimise disruptions where possible. 
  • We don’t expect the proposed works to impact your water supply, or other utilities. 
  • The contractors will adhere to COVID – 19 work safety practices. 

For more information, please email [email protected] or call 1300 SEQWATER (1300 737 928) during business hours.