Corporate publications
Our corporate plans and reports
We produce a range of publications to provide the community and stakeholders with information about our operations and activities.
Strategic plan
Sets out our strategic direction, purpose and key priorities.
Previous strategic plans
Operational plan
The performance agreement between us and our responsible Ministers that sets our financial and non-financial performance targets for the year.
Previous operational plans
Annual reports
Annual performance report against targets set out in the operational plan for the financial year.
Seqwater Annual Report 2024-25
The materials presented on this site are provided by the Queensland Government for information purposes only. Users should note that the electronic versions of the annual report, including the financial statements, on this site are not recognised as the official or authorised version. The electronic versions are provided solely on the basis that users will take responsibility for verifying their accuracy, completeness and currency. Although considerable resources are used to prepare and maintain the electronic versions, the Queensland Government accepts no liability for any loss or damage that may be incurred by any person acting in reliance on the electronic versions. The official copy of the annual report, as tabled in the Legislative Assembly of Queensland can be accessed from the Queensland Parliament’s tabled papers website database: Link to Online Tabled Papers | Queensland Government All content in the printed (tabled) annual report is available online.
Previous annual reports
Corporate governance statement
This statement is to be read in conjunction with Seqwater's Annual Report and explains how Seqwater complies with the expectations for statutory authorities as set out in the Corporate Governance Guidelines for Government Owned Corporations, Version 2.0 (Queensland Treasury: February 2009).
Previous corporate governance statements
Other
Water Security Program 2023
Our blueprint for managing water over the next 30 years, within the guidelines set by the Department of Natural Resources, Mines and Energy. Find out more about water security.
Queensland Bulk Water Supply Authority Performance Report 2024-25
Our annual report on the performance reporting framework against key performance indicators (KPIs), as per the Water Supply (Safety and Reliability) Act 2008.
Policy statements
Our policy statements outline our commitment to the areas of:
Operational plans and reports
South East Queensland (SEQ) Bulk Water Supply Code
Administered by Department of Energy and Water Supply, regulates the supply of bulk services such as the supply of water and water services, between Code-regulated Entities (e.g. Council and council-owned service providers).
Volume Calculation Methodology (VCM)
The VCM is used to calculate the cost of providing a Bulk Service to an un-metered Bulk Supply Point. The VCM may be reviewed if requested by a Code-regulated Entity and Seqwater will undertake consultation with affected Code-regulated entities prior to making any amendment to the VCM.
Technical Standard Specification - Supply and installation bulk supply meters for potable water
This standard specification provides the minimum requirements for Seqwater work relation to the design, supply and installation of bulk supply (revenue) meters for potable water. It does not apply to meters used for non-revenue applications.
Flood manuals and emergency plans
Manual of Operational Procedures for Flood Mitigation at North Pine Dam Revision 13 (December 2025)
Emergency Action Plans for referable dams
You can view and download the approved action plans for each of our referable dams on the Business Queensland website.
Drinking water service annual reports
Drinking Water Service Annual Report 2024-2025 (final signed version)
- Enclosure 1a - Verification Monitoring 2024-2025 - Water Quality Data Report
- Enclosure 1b - Verification Monitoring 2024-2025 - Water Quality Data from Offline SEQ Water Grid Sampling Points
- Enclosure 2a - Winter 2024 - Catchment and Drinking Water Quality Micro Pollutant Monitoring Program - Passive Sampling
- Enclosure 2b - Summer 2025 - Catchment and Drinking Water Quality Micro Pollutant Monitoring Program - Passive Sampling
- Enclosure 3 - Drinking Water Quality Improvement Plan (DWQIP) Current 30 June 2025
- Enclosure 4 - Register of Changes to DWQMP, HACCP Plans and Procedures current 30 June 2025
Previous drinking water service annual reports
Drinking Water Service Annual Report 2023-2024 (final)
- Enclosure 1a - Verification Monitoring 2023-2024 - Water Quality Data Report
- Enclosure 1b - Verification Monitoring 2023-2024 - Water Quality Data from Offline SEQ Water Grid Sampling Points
- Enclosure 1c - Verification Monitoring 2023-2024 - PFAS Data Report
- Enclosure 2a - Winter 2023 - Catchment and Drinking Water Quality Micro Pollutant Monitoring Program - Passive Sampling
- Enclosure 2b - Summer 2024 - Catchment and Drinking Water Quality Micro Pollutant Monitoring Program - Passive Sampling
- Enclosure 3 - Drinking Water Quality Improvement Plan (DWQIP) Current 30 June 2024
- Enclosure 4 - Register of Changes to DWQMP, HACCP Plans and Procedures
Drinking Water Service Annual Report 2022-2023 (final)
- Enclosure 1a - Verification monitoring 2022-2023 Water Quality data report
- Enclosure 1b - Verification monitoring 2022-2023 Water Quality data from offline SEQ Water Grid sampling points
- Enclosure 2a - Winter 2022 - Catchment and Drinking Water Quality Micro Pollutant Monitoring Program - Passive Sampling
- Enclosure 2b - Summer 2023 - Catchment and Drinking Water Quality Micro Pollutant Monitoring Program - Passive Sampling
- Enclosure 3 - Drinking Water Quality Improvement Plan (DWQIP) Current 30 June 2023
- Enclosure 4 - Register of changes to DWQMP, HACCP plans and procedures
Drinking Water Quality Management Plan Annual Report 2021-2022
- Enclosure 1 Verification monitoring 2021-2022 Water Quality data report
- Enclosure 2a Report Winter 2021 - Catchment and Drinking Water Quality Micro Pollutant Monitoring Program Passive Sampling
- Enclosure 2b Report Summer 2022 - Catchment and Drinking Water Quality Micro Pollutant Monitoring Program Passive Sampling
- Enclosure 3 Drinking Water Quality Improvement Plan (DWQIP)
- Enclosure 4 Register of changes to DWQMP, HACCP plans and procedures
Drinking Water Quality Management Plan (DWQMP) Annual Report 2020-21
- Enclosure 1 - 2019-20 water quality data report
- Enclosure 2a - Catchment and water quality micro pollutant monitoring program - passive sampling Winter 2019 report
- Enclosure 2b - Catchment and water quality micro pollutant monitoring program - passive sampling Summer 2020 report
- Enclosure 3 - Drinking Water Quality Improvement Plan (DWQIP)
- Enclosure 4 - Register of changes to DWQMP, HACCP plans and procedures.
Drinking Water Quality Management Plan (DWQMP) Annual Report 2019-20
- Enclosure 1 - 2019-20 water quality data report
- Enclosure 2a - Catchment and water quality micro pollutant monitoring program - passive sampling Winter 2019 report
- Enclosure 2b - Catchment and water quality micro pollutant monitoring program - passive sampling Summer 2020 report
- Enclosure 3 - Drinking Water Quality Improvement Plan (DWQIP)
- Enclosure 4 - Register of changes to DWQMP, HACCP plans and procedures
- Enclosure 5 - Register of audit of Seqwater DWQMP for WSR 2020
Drinking Water Quality Management Plan (DWQMP) Annual Report 2018-19
- Enclosure 1 - Verification monitoring 2018-19
- Enclosure 2a - 2018 Winter Catchment and Drinking Water Quality Micropollutant Monitoring Program - Passive Sampling
- Enclosure 2b - 2019 Summer Catchment and Drinking Water Quality Micropollutant Monitoring Program - Passive Sampling
- Enclosure 3 - Drinking Water Quality Improvement Plan
- Enclosure 4 - Register of changes to DWQMP, HACCP plans and procedures.
Western Corridor Recycled Water Scheme (WCRWS) Recycled Water Management Plan annual report
- Enclosure 1 Source water (treated wastewater) annual water quality report 2024-2025
- Enclosure 2a Luggage Point AWTP Point of Supply assessment against augmentation of a drinking water supply water quality criteria 2024-2025
- Enclosure 2b Lake Wivenhoe Point of Supply assessment against augmentation of a drinking water supply water quality criteria 2024-2025
- Enclosure 3 Source water (treated wastewater) annual water quality report 2023-2024 for passive sample (data not available at the time of the previous publication of the annual report)
Previous WCRWS recycled water management plan annual reports
- Enclosure 1 Luggage Point AWTP Source Water Data water quality report 2023-2024
- Enclosure 2a Luggage Point AWTP Point of Supply assessment against augmentation of a drinking water supply water quality criteria 2023-2024
- Enclosure 2b Lake Wivenhoe Point of Supply assessment against augmentation of a drinking water supply water quality criteria 2023-2024
- Enclosure 1 Luggage Point AWTP Source Water Data water quality report 2022-2023
- Enclosure 2a Luggage Point AWTP Point of Supply assessment against augmentation of a drinking water supply water quality criteria 2022-2023
- Enclosure 2b Lake Wivenhoe Point of Supply assessment against augmentation of a drinking water supply water quality criteria 2022-2023
- Enclosure 3 Reporting of regular audit in Recycled Water Management Plan Annual Report 2021-2022
Western Corridor Recycled Water Scheme (WCRWS) Management Plan Annual Report 2021-22
- Enclosure 1 - Luggage Point AWTP Source Water data water quality report 2021-22
- Enclosure 2a - Luggage Point AWTP Point of Supply assessment against augmentation of a drinking water supply water quality criteria 2021-22
- Enclosure 2b - Lake Wivenhoe Point of Supply assessment against augmentation of a drinking water supply water quality criteria 2021-22
- Enclosure 3 - Luggage Point AWTP and Lake Wivenhoe Points of Supply incidents for noncompliance with water quality criteria: failure to test or missing data 2021-22
Western Corridor Recycled Water Scheme Annual Report 2020-21
- Enclosure 1 - Luggage Point AWTP Source Water data 2020-2021
- Enclosure 2a - Luggage Point AWTP Point of Supply against augmentation of a drinking water supply water quality criteria
- Enclosure 2b - Lake Wivenhoe Point of Supply assessment against augmentation of a drinking water supply water quality criteria
- Enclosure 3 - Memorandum - Regular Review of the Western Corridor Recycled Water Scheme Recycled Water Management Plan (RWMP)
Western Corridor Recycled Water Scheme Annual Report 2019-20
Western Corridor Recycled Water Scheme RWMP Annual Report 2018-19
Appendix A - Luggage Point AWTP Point of Supply Augmentation of Drinking Water Supply Data Analysis
Western Corridor Recycled Water Scheme Annual Report 2017-18
25 February - 9 March 2022 flood event reports
February 2022 Flood Event report on operation of North Pine Dam
February 2022 Flood Event report on operation of Somerset Dam and Wivenhoe Dam
Other
Wyaralong Dam Estuarine Ecological Management Plan Annual Report
In accordance with the Environmental Protection and Biodiversity Conservation approval for operation of the Wyaralong Dam (ref: 2006/3157), Seqwater is required to publish the annual report for the Wyaralong Dam Estuarine Ecological Management Plan (EEMP). The report documents as a review of the monitoring data collected in 2012. Based on the indicators assessed in 2011 and 2012, no detrimental changes in physical, chemical or ecological conditions in the Logan River estuary or southern Moreton Bay were attributable to the Wyaralong Dam construction or operation.
Banksia Beach - Borefield Environmental Management Plan
In accordance with the approval (ref: 2007/3396) issued under the Environmental Protection and Biodiversity Conservation Act (1999), for the Bribie Island Water Treatment Plant and Borefield, Seqwater is required to publish the Borefield Environmental Management Plan.
Annual Compliance Report: Banksia Beach Water Treatment Plant & Borefield (EPBC 2007/3396) 1 September 2024 to 31 August 2025
In accordance with the approval (ref: 2007/3396) issued under the Environmental Protection and Biodiversity Conservation Act 1999, this annual compliance report is the tenth compliance report on the operation and management of the Banksia Beach Water Treatment Plant and Borefield under the Borefield Environmental Management Plan (BEMP). This report addressed compliance with the conditions of approval between 1 September 2024 and 31 August 2025.
Annual Compliance Report: Northern Pipeline Interconnector Stage 2 (NPI2) (EPBC 2007/3686) 15 February 2025 to 15 February 2026
This Annual Compliance Report marks the sixteenth Matters of National Environmental Significance (MNES) assessment for the Northern Pipeline Interconnector Stage 2 (NPI2), covering 15 February 2025 to 15 February 2026. This report addresses compliance with the conditions set under the Environmental Protection and Biodiversity Conservation Act 1999 (EPBC Act) approval 2007/3686.