Corporate publications

Our corporate plans and reports

We produce a range of publications to provide the community and stakeholders with information about our operations and activities.

 

Strategic plan

Sets out our strategic direction, purpose and key priorities.

Seqwater Strategic Plan 2026-30

 

Operational plan

The performance agreement between us and our responsible Ministers that sets our financial and non-financial performance targets for the year.

Seqwater Operational Plan 2024-25

 

Annual reports

Annual performance report against targets set out in the operational plan for the financial year.

Seqwater Annual Report 2024-25

The materials presented on this site are provided by the Queensland Government for information purposes only. Users should note that the electronic versions of the annual report, including the financial statements, on this site are not recognised as the official or authorised version. The electronic versions are provided solely on the basis that users will take responsibility for verifying their accuracy, completeness and currency. Although considerable resources are used to prepare and maintain the electronic versions, the Queensland Government accepts no liability for any loss or damage that may be incurred by any person acting in reliance on the electronic versions. The official copy of the annual report, as tabled in the Legislative Assembly of Queensland can be accessed from the Queensland Parliament’s tabled papers website database: Link to Online Tabled Papers | Queensland Government All content in the printed (tabled) annual report is available online.

 

Corporate governance statement

This statement is to be read in conjunction with Seqwater's Annual Report and explains how Seqwater complies with the expectations for statutory authorities as set out in the Corporate Governance Guidelines for Government Owned Corporations, Version 2.0 (Queensland Treasury: February 2009).

Corporate Governance Statement 2024-25

 

Other

Water Security Program 2023
Our blueprint for managing water over the next 30 years, within the guidelines set by the Department of Natural Resources, Mines and Energy. Find out more about water security.

Queensland Bulk Water Supply Authority Performance Report 2024-25
Our annual report on the performance reporting framework against key performance indicators (KPIs), as per the Water Supply (Safety and Reliability) Act 2008.

Operational plans and reports

South East Queensland (SEQ) Bulk Water Supply Code
Administered by Department of Energy and Water Supply, regulates the supply of bulk services such as the supply of water and water services, between Code-regulated Entities (e.g. Council and council-owned service providers).

Volume Calculation Methodology (VCM)
The VCM is used to calculate the cost of providing a Bulk Service to an un-metered Bulk Supply Point. The VCM may be reviewed if requested by a Code-regulated Entity and Seqwater will undertake consultation with affected Code-regulated entities prior to making any amendment to the VCM.

Technical Standard Specification - Supply and installation bulk supply meters for potable water
This standard specification provides the minimum requirements for Seqwater work relation to the design, supply and installation of bulk supply (revenue) meters for potable water. It does not apply to meters used for non-revenue applications.

 

Flood manuals and emergency plans

Manual of Operational Procedures for Flood Mitigation at Wivenhoe Dam and Somerset Dam Revision 18 (November 2024)

Manual of Operational Procedures for Flood Mitigation at North Pine Dam Revision 13 (December 2025)

Previous drinking water service annual reports

Drinking Water Service Annual Report 2023-2024 (final)

Drinking Water Service Annual Report 2022-2023 (final)

Drinking Water Quality Management Plan Annual Report 2021-2022

Drinking Water Quality Management Plan (DWQMP) Annual Report 2020-21

Drinking Water Quality Management Plan (DWQMP) Annual Report 2019-20

Drinking Water Quality Management Plan (DWQMP) Annual Report 2018-19

Previous WCRWS recycled water management plan annual reports

Western Corridor Recycled Water Scheme (WCRWS) Recycled Water Management Plan (RWMP) Annual Report 2023-24

Western Corridor Recycled Water Scheme (WCRWS) Recycled Water Management Plan (RWMP) Annual Report 2022-23

Western Corridor Recycled Water Scheme (WCRWS) Management Plan Annual Report 2021-22

Western Corridor Recycled Water Scheme Annual Report 2020-21

Western Corridor Recycled Water Scheme Annual Report 2019-20

Western Corridor Recycled Water Scheme RWMP Annual Report 2018-19
Appendix A - Luggage Point AWTP Point of Supply Augmentation of Drinking Water Supply Data Analysis 

Western Corridor Recycled Water Scheme Annual Report 2017-18

 

Other

Wyaralong Dam Estuarine Ecological Management Plan Annual Report
In accordance with the Environmental Protection and Biodiversity Conservation approval for operation of the Wyaralong Dam (ref: 2006/3157), Seqwater is required to publish the annual report for the Wyaralong Dam Estuarine Ecological Management Plan (EEMP). The report documents as a review of the monitoring data collected in 2012. Based on the indicators assessed in 2011 and 2012, no detrimental changes in physical, chemical or ecological conditions in the Logan River estuary or southern Moreton Bay were attributable to the Wyaralong Dam construction or operation.

Banksia Beach - Borefield Environmental Management Plan
In accordance with the approval (ref: 2007/3396) issued under the Environmental Protection and Biodiversity Conservation Act (1999), for the Bribie Island Water Treatment Plant and Borefield, Seqwater is required to publish the Borefield Environmental Management Plan.  

Annual Compliance Report: Banksia Beach Water Treatment Plant & Borefield (EPBC 2007/3396) 1 September 2024 to 31 August 2025
In accordance with the approval (ref: 2007/3396) issued under the Environmental Protection and Biodiversity Conservation Act 1999, this annual compliance report is the tenth compliance report on the operation and management of the Banksia Beach Water Treatment Plant and Borefield under the Borefield Environmental Management Plan (BEMP). This report addressed compliance with the conditions of approval between 1 September 2024 and 31 August 2025.

Annual Compliance Report: Northern Pipeline Interconnector Stage 2 (NPI2) (EPBC 2007/3686) 15 February 2025 to 15 February 2026
This Annual Compliance Report marks the sixteenth Matters of National Environmental Significance (MNES) assessment for the Northern Pipeline Interconnector Stage 2 (NPI2), covering 15 February 2025 to 15 February 2026. This report addresses compliance with the conditions set under the Environmental Protection and Biodiversity Conservation Act 1999 (EPBC Act) approval 2007/3686.